LIFE EXTENSION WORK

De Raj Group carried out life extension work on the following vessels:

February 2012 – May 2012

Project Life Extension
Client Halcyon Energy Sdn. Bhd.
Location Batam, Indonesia
Asset Halcyon 1
Life Extension Feb 2012 – May 2012
Contract Value US$3.8 million
Scope of Work
  • Leg to mat connection renewal
  • Installation of sacrificial anodes
  • Thickness gauging and steel replacement
  • Refurbishment of marine systems including marine power generators, jacking systems, etc
  • Removal of drilling equipment

September 2012 – December 2012

Project Life Extension
Client Halcyon Energy Sdn. Bhd.
Location Batam, Indonesia
Asset Halcyon 2
Life Extension Sep 2012 – Dec 2012
Contract Value US$4 million
Scope of Work
  • Leg to mat connection renewal
  • Installation of sacrificial anodes
  • Thickness gauging and steel replacement
  • Refurbishment of marine systems including marine power generators, jacking systems, etc
  • Removal of drilling equipment

October 2012 – January 2013

Project Rig Reactivation & Refurbishment
Client Falcon Energy (L) Inc.
Location Singapore
Asset BOSS 6
Reactivation Oct 2012 – Jan 2013
Contract Value US$18 million
Scope of Work
  • Refurbishment all drilling equipment
  • Servicing of all pumps, mud pumps, deep well pumps, etc
  • Complete refurbishment of marine systems, power generators, cranes, water makers, etc
  • Complete refitting and renovation of living quarters for 80 man
  • Refurbishment of helideck
Capacities
  • 20,000 feet drilling depth
  • 15 feet by 40 feet drilling envelope

April 2012 – July 2012

Project Life Extension
Client Eagle Energy (L) Inc.
Location Batam, Indonesia
Asset Cesano
Life Extension Apr 2012 – July 2012
Contract Value US$3.5 million
Scope of Work
  • Leg to mat connection renewal
  • Installation of sacrificial anodes
  • Thickness gauging and steel replacement
  • Refurbishment of marine systems including marine power generators, jacking systems, etc
  • Removal of drilling equipment